User's Manual

605-0000-595 Subscriber Terminal Installation and Commissioning
166
Type 42
Pre-installation
Before the ST is installed, the installation acceptance criteria should be established. These
are outputs from RF Planning as listed above. They are in summary:
o Corresponding STID
o RF Channel/Pilot Channel
o PN Code
o Expected Downlink Modulation (FEC Mode)
o Expected Uplink Modulation (FEC Mode)
o Required Fade Margin
o Required Downlink SNR
These parameters can be input to STMon during installation. It is expected that the installer
will be informed of these values via a job instruction relating to the particular ST to be
installed.