User's Manual

iRelay 460 Equipment Installation Guide
UGD-D01035
Airspan Commercial and Internal Use 33
D RFI Checklist
Before installation, review all details in the following checklist. It lists the details of parameters and
items that need to be gathered before the equipment installation.
No Site Readiness Details Comments
1 Site Details
1.1 Site name
1.2 Site ID
1.3 Site address
1.4 Site GPS coordinate
(DD MM SS)
Latitude
Longitude
1.5 Site type
Tower Pole Building Other
Other:
1.6 Access details to the site
1.7 Contact details of site engineer
1.8 Permission for installation
1.9 IP plan available
1.10 Transmission plan available
1.11 Link budget available
2 Electrical
2.1 Type of power supply
AC DC No power
2.2 Location of the power point
2.3 Isolation switch installed
Yes No
2.4 MCB installed with power connectivity
Yes No
2.5 Location for PoE
2.6 PoE to power source distance
2.7 PoE to iR460 distance
3 Earthing/Grounding
3.1 Earth connectivity is available
Yes No
3.2 Earth of tower/pole verified
Yes No
3.3 Cable trays are earthed (if applicable)
Yes No
4 Tower/Pole
4.1 Tower/pole height as per survey report