User's Manual
iRelay 460 Equipment Installation Guide
UGD-D01035
Airspan Commercial and Internal Use 31
C Initial Site Survey
During initial site survey, review all details in the following checklist. It lists the details of parameters
and items that need to be confirmed before the equipment installation.
No Survey Details Comments
1 Site Details
1.1 Site name
1.2 Site ID
1.3 Site address
1.4 Site GPS coordinate
(DD MM SS)
Latitude
Longitude
1.5 AMSL
1.6 Site type
☐ Tower ☐ Pole ☐ Building ☐ Other
Other:
1.7 Access details to the site
1.8 Contact details of the site engineer
1.9 Type of the terrain
☐ Smooth ☐ Mountainous ☐ Average
1.10 Climate
☐ Humid ☐ Dry ☐ Average
1.11 Required annual availability
☐ 99% ☐ 99.9% ☐ 99.99%
2 Electrical
2.1 Type of power supply
☐ AC ☐ DC
2.2 Location of the power point
2.3 Location for PoE
2.4 PoE to power source distance
2.5 PoE to iR460 distance
3 Earthing/Grounding
3.1 Earth connectivity is point Radio PoE Surge
☐ Yes
☐ No
☐ Yes
☐ No
☐ Yes
☐ No