User's Manual
Table Of Contents
- Installation
- Overview AS4000
- Overview AS4020
- Preparation
- Rack Installation
- AS4000 AC Rack Cabling and Wiring
- AS4000 CT Shelf Cabling and Wiring
- _
- Expansion Rack Cabling
- Setup and Test
- System Testing
- AS4000 AC Setup and Test
- Access Concentrator: Turn-Up and DC measurements
- Setting Up the Access Concentrator
- _
- Setting the TEI and Baud Rate for Netspan Connection
- Creating AC Shelf/Rack on Sitespan
- Setting up AC Rack and Shelf configuration
- Configure AC Cards
- Configure AC Shelf properties
- Check Boot Sequence
- Alarm and Status Indications (Test 3)
- Self Test (Test 4)
- Test CTU cabling to the DDF E1 Cards
- Test CTU cabling to the Distribution Frame (DDF) GR303 Cards.
- Test XTU cabling to the DDF
- Connecting the AC to the Network
- Connect E1s/T1s to the Switch or Cross-Connect at the DDF
- Access Concentrator Rack Commissioning Test Results
- AS4000 CT Setup and Test
- AS4020 CT Setup and Test
- _
- General
- Repair and Return Procedure
- Repair Charges
- Return & Repair Tag
- Packing and Shipment
- Glossary
- Index
Installation
77
Insert the following cards into each Modem Shelf: -
2 x PSUs Slots 1 and 2.
1 x Analogue Card (AU) Slot 16.
1 x Demand Assignment Tributary Card (DTU). Slot 5.
1 x Shelf Controller (SC) Slot 3.
Modem Cards Slots 10 to 15.
Fit RF Coupler for using a DACU
Fit RF Coupler for connection of systems to the DA Control Unit for commissioning.
A 30dB coupler should be fitted to the male N-Type connector at the top of the DIP/LNA1 and
the DIP/LNA2 (if fitted). Port J1 fits onto the DIP/LNA module and the antenna feed fits on to
port J2. The coupler should be orientated as shown in so that the SMA port faces to the right
side of the rack (when viewed from the front) to allow easy access for test leads. Note some
3.4-3.6GHz systems may not have couplers fitted.
Connect Antenna
If the Rack is fitted with couplers connect antenna at this stage. Do not connect antenna at
this stage on systems without couplers fitted.
Note: See Antenna and Feeder Installation and Commissioning Procedure, 605-0000-503 for