User's Manual
Table Of Contents
- Installation
- Overview AS4000
- Overview AS4020
- Preparation
- Rack Installation
- AS4000 AC Rack Cabling and Wiring
- AS4000 CT Shelf Cabling and Wiring
- _
- Expansion Rack Cabling
- Setup and Test
- System Testing
- AS4000 AC Setup and Test
- Access Concentrator: Turn-Up and DC measurements
- Setting Up the Access Concentrator
- _
- Setting the TEI and Baud Rate for Netspan Connection
- Creating AC Shelf/Rack on Sitespan
- Setting up AC Rack and Shelf configuration
- Configure AC Cards
- Configure AC Shelf properties
- Check Boot Sequence
- Alarm and Status Indications (Test 3)
- Self Test (Test 4)
- Test CTU cabling to the DDF E1 Cards
- Test CTU cabling to the Distribution Frame (DDF) GR303 Cards.
- Test XTU cabling to the DDF
- Connecting the AC to the Network
- Connect E1s/T1s to the Switch or Cross-Connect at the DDF
- Access Concentrator Rack Commissioning Test Results
- AS4000 CT Setup and Test
- AS4020 CT Setup and Test
- _
- General
- Repair and Return Procedure
- Repair Charges
- Return & Repair Tag
- Packing and Shipment
- Glossary
- Index
Printed Documentation
76
Insert the following modules and secure:-
1 RF Power Amplifier Module (2 PA’s) in the left hand position in the combiner shelf
1 x Low Noise Amplifier + Diplexer (DIP/LNA 1) (Terminate output with 50ohm
termination.)
2 x PSU’s
2 x Combiner Monitor Card (Monitor 1 303-043-900 & Monitor 2 303-043-901)
For each modem shelf provided install 1 x RF Card (RF)
If an Expansion Rack has been installed also insert the following modules in the RF combiner
shelf located in the DA CT Rack and secure:-
1 RF Power Amplifier Module (2 PAs per module) in the right hand position in the
combiner shelf - note the orientation of this module.
1 DIP/LNA (Terminate output with 50ohm termination.)
1 x PSU
For each modem shelf provided install 1 x RF Card (RF)
Fit Cards in Modem Shelf