User's Manual
Table Of Contents
- Installation
- Overview AS4000
- Overview AS4020
- Preparation
- Rack Installation
- AS4000 AC Rack Cabling and Wiring
- AS4000 CT Shelf Cabling and Wiring
- _
- Expansion Rack Cabling
- Setup and Test
- System Testing
- AS4000 AC Setup and Test
- Access Concentrator: Turn-Up and DC measurements
- Setting Up the Access Concentrator
- _
- Setting the TEI and Baud Rate for Netspan Connection
- Creating AC Shelf/Rack on Sitespan
- Setting up AC Rack and Shelf configuration
- Configure AC Cards
- Configure AC Shelf properties
- Check Boot Sequence
- Alarm and Status Indications (Test 3)
- Self Test (Test 4)
- Test CTU cabling to the DDF E1 Cards
- Test CTU cabling to the Distribution Frame (DDF) GR303 Cards.
- Test XTU cabling to the DDF
- Connecting the AC to the Network
- Connect E1s/T1s to the Switch or Cross-Connect at the DDF
- Access Concentrator Rack Commissioning Test Results
- AS4000 CT Setup and Test
- AS4020 CT Setup and Test
- _
- General
- Repair and Return Procedure
- Repair Charges
- Return & Repair Tag
- Packing and Shipment
- Glossary
- Index
Printed Documentation
4
Preparation
Preparatory Tasks
Installation Tools and Equipment
The following lists of tools and equipment are required to successfully install and test the
AS4000 Access Concentrator Racks.
Required Tools
Combination Spanners: 8 mm, 13 mm, 17 mm, & 19 mm.
Spirit Level: 18 inch.
Pozidrive: No 1 x 75 mm.
No 2 x 100 mm
;No 3 x 150 mm.
Screwdriver, flat blade: 3 mm x 100 mm.
Screwdriver, flat blade: 5.5 mm x 100 mm.
Screwdriver, flat blade: 8 mm x 150 mm.
Hammer, Ball Pein: 1lb.
Drill Bits, Masonry: 11 mm, 12 mm, 13 mm.
Ratchet Crimp Tool for red, blue and yellow insulated crimps.
Crimp Tool type 6A with VQ dies for co-ax connectors and optionally Type 43
connectors
Cordless Drill/Driver.
Required Equipment
Description Recommended Model Quantity
1 Digital Multimeter Fluke 77 or similar 1
2 50 ohm Termination 15W Suhner 6515.17.A 2
3 Test Lead for Management Port Airspan proprietary item 1
4 RF Power Meter Amritsu Sitemaster 400A or
Marconi 6970
1
5 Power Sensor Amritsu 560-7N50B or
Marconi 6932
6 Sensor 30dB 5W attenuator for use
with Amiritsu Power Sensor
HP8491 N-type 1
7 DA Commissioning Unit and
associated cables
Airspan proprietary item 1
Site Readiness
Verify that the site is ready for the installation of the CT Racks.
This preparation will have been covered by a site survey conducted by Airspan Networks
or by a survey form completed by the customer. The survey will include a site plan of the
facility identifying the floor layout, power outlets, distribution boxes, and cabling runways.
A sketch showing the rack support arrangements showing the exact positions of the
mounting points on the rack with dimensions, and typical overhead ironwork provision
should be included.
Inspect the site, and particularly the equipment room, before unloading or unpacking the
equipment to ensure the following: