User's Manual
Table Of Contents
- Installation
- Overview AS4000
- Overview AS4020
- Preparation
- Rack Installation
- AS4000 AC Rack Cabling and Wiring
- AS4000 CT Shelf Cabling and Wiring
- _
- Expansion Rack Cabling
- Setup and Test
- System Testing
- AS4000 AC Setup and Test
- Access Concentrator: Turn-Up and DC measurements
- Setting Up the Access Concentrator
- _
- Setting the TEI and Baud Rate for Netspan Connection
- Creating AC Shelf/Rack on Sitespan
- Setting up AC Rack and Shelf configuration
- Configure AC Cards
- Configure AC Shelf properties
- Check Boot Sequence
- Alarm and Status Indications (Test 3)
- Self Test (Test 4)
- Test CTU cabling to the DDF E1 Cards
- Test CTU cabling to the Distribution Frame (DDF) GR303 Cards.
- Test XTU cabling to the DDF
- Connecting the AC to the Network
- Connect E1s/T1s to the Switch or Cross-Connect at the DDF
- Access Concentrator Rack Commissioning Test Results
- AS4000 CT Setup and Test
- AS4020 CT Setup and Test
- _
- General
- Repair and Return Procedure
- Repair Charges
- Return & Repair Tag
- Packing and Shipment
- Glossary
- Index
Printed Documentation
158
PSU3
Modem Shelves
AS4020 shelf 1
AS4020 shelf 2
AS4020 shelf 3
AS4020 shelf 4
Rack ID
TEST
#
TEST LIMIT RESULT
Site Inspection & Verification
Modem Shelf 1
Modem Shelf 2
Modem Shelf 3
T1/E1Cabling
Modem Shelf 4
System Commissioning Tests
CT Rack Supply 1 -36.0 to -
60.0V DC
CT Rack Supply 1
Extn Rack Supply 1
Test
1a
Exchange DC Voltage
Extn Rack Supply 2
CT Rack Supply 1 -36.0 to -
60.0V DC
CT Rack Supply 2
Extn Rack Supply 1
Test
1b
Exchange DC Voltage
Expn Rack Supply 2
PSU 1 Output Voltage 13.5 VDC ; +/-500mV
PSU 2 Output Voltage 13.5 VDC ; +/-500mV
Test
2
PSU 3 Output Voltage 13.5 VDC ; +/-500mV