User's Manual
Table Of Contents
- Installation
- Overview AS4000
- Overview AS4020
- Preparation
- Rack Installation
- AS4000 AC Rack Cabling and Wiring
- AS4000 CT Shelf Cabling and Wiring
- _
- Expansion Rack Cabling
- Setup and Test
- System Testing
- AS4000 AC Setup and Test
- Access Concentrator: Turn-Up and DC measurements
- Setting Up the Access Concentrator
- _
- Setting the TEI and Baud Rate for Netspan Connection
- Creating AC Shelf/Rack on Sitespan
- Setting up AC Rack and Shelf configuration
- Configure AC Cards
- Configure AC Shelf properties
- Check Boot Sequence
- Alarm and Status Indications (Test 3)
- Self Test (Test 4)
- Test CTU cabling to the DDF E1 Cards
- Test CTU cabling to the Distribution Frame (DDF) GR303 Cards.
- Test XTU cabling to the DDF
- Connecting the AC to the Network
- Connect E1s/T1s to the Switch or Cross-Connect at the DDF
- Access Concentrator Rack Commissioning Test Results
- AS4000 CT Setup and Test
- AS4020 CT Setup and Test
- _
- General
- Repair and Return Procedure
- Repair Charges
- Return & Repair Tag
- Packing and Shipment
- Glossary
- Index
Setup and Test
143
Attenuator
(30dB), 5W
2 Second and third in line from combiner
Adaptor (N to
SMA)
1 Needed to connect N-type pads to 4m cable
SMA Torque
spanner
1 To tighten SMA's
Termination
(50 Ohm)
1 Terminates an unused power meter port
Laminated
Kitting /
Calibration
sheet (front)
1 A sheet showing a labelled photograph of all the RF Module Kit
items, underneath which there is a table to fill out all the calibration
details.
Laminated
Pro-forma
worksheet (on
reverse of
above)
1 To calculate overall insertion losses between CT and DACU RF
Module
Marker Pen 1 To fill in calibration details on laminates