User's Manual
Table Of Contents
- Installation
- Overview AS4000
- Overview AS4020
- Preparation
- Rack Installation
- AS4000 AC Rack Cabling and Wiring
- AS4000 CT Shelf Cabling and Wiring
- _
- Expansion Rack Cabling
- Setup and Test
- System Testing
- AS4000 AC Setup and Test
- Access Concentrator: Turn-Up and DC measurements
- Setting Up the Access Concentrator
- _
- Setting the TEI and Baud Rate for Netspan Connection
- Creating AC Shelf/Rack on Sitespan
- Setting up AC Rack and Shelf configuration
- Configure AC Cards
- Configure AC Shelf properties
- Check Boot Sequence
- Alarm and Status Indications (Test 3)
- Self Test (Test 4)
- Test CTU cabling to the DDF E1 Cards
- Test CTU cabling to the Distribution Frame (DDF) GR303 Cards.
- Test XTU cabling to the DDF
- Connecting the AC to the Network
- Connect E1s/T1s to the Switch or Cross-Connect at the DDF
- Access Concentrator Rack Commissioning Test Results
- AS4000 CT Setup and Test
- AS4020 CT Setup and Test
- _
- General
- Repair and Return Procedure
- Repair Charges
- Return & Repair Tag
- Packing and Shipment
- Glossary
- Index
Setup and Test
119
2.0-2.3GHz +27dBm
2.3-2.5GHz +27dBm
3.4-3.6GHz +24dBm
11. Set RW1 to OOS(160K) and all other RWs OOS
12. Measure the output power: ensure the level is as in the table below
Band Reading
±1dB
1.8-1.9GHz +20dBm
2.0-2.3GHz +21dBm
2.3-2.5GHz +21dBm
3.4-3.6GHz +18dBm
13. Repeat power reading for single RW OOS(160k), for all other individual RWs
14. Record the result (see Test Results)
15. On the DTU card view click the End Commissioning button (this re-activates RWs
14 & 15 and sets all RWs IS.
16. Repeat for all other modem shelves.