User's Manual

Table Of Contents
Printed Documentation
116
Figure Power Level measurement Test Set-Up
Measure the output of shelf 1. (This test is repeated for other installed shelves)
1. Remove the RF cards for all but the shelf being commissioned
2. Connect Sitespan to the shelf under test. See Connection to Sitespan
3. Open The DTU Card View and click the Commission Button. This button places the
shelf into an internal commissioning test mode. This button is clicked before the
commissioning procedure is started. This turns of the Link Acquisition and Call
Control Channels off.