User's Manual
Table Of Contents
- Installation
- Overview AS4000
- Overview AS4020
- Preparation
- Rack Installation
- AS4000 AC Rack Cabling and Wiring
- AS4000 CT Shelf Cabling and Wiring
- _
- Expansion Rack Cabling
- Setup and Test
- System Testing
- AS4000 AC Setup and Test
- Access Concentrator: Turn-Up and DC measurements
- Setting Up the Access Concentrator
- _
- Setting the TEI and Baud Rate for Netspan Connection
- Creating AC Shelf/Rack on Sitespan
- Setting up AC Rack and Shelf configuration
- Configure AC Cards
- Configure AC Shelf properties
- Check Boot Sequence
- Alarm and Status Indications (Test 3)
- Self Test (Test 4)
- Test CTU cabling to the DDF E1 Cards
- Test CTU cabling to the Distribution Frame (DDF) GR303 Cards.
- Test XTU cabling to the DDF
- Connecting the AC to the Network
- Connect E1s/T1s to the Switch or Cross-Connect at the DDF
- Access Concentrator Rack Commissioning Test Results
- AS4000 CT Setup and Test
- AS4020 CT Setup and Test
- _
- General
- Repair and Return Procedure
- Repair Charges
- Return & Repair Tag
- Packing and Shipment
- Glossary
- Index
Printed Documentation
104
Cabling
Shelf 2
System Commissioning Tests
Exchange DC Voltage Supply
1
Test
1a
Exchange DC Voltage Supply
2
-21.8 to -60.0V DC
Exchange DC Voltage Supply
1
Test
1b
Exchange DC Voltage Supply
2
-21.8 to -60.0V DC
5V DC 250mV
3.3V DC +0mV-300mV
AC Shelf 1 PSU1
2.1V DC+0mV-100mV
5V DC 250mV
3.3V DC +0mV-300mV
AC Shelf 1 PSU2
2.1V DC+0mV-100mV
5V DC 250mV
3.3V DC +0mV-300mV
AC Shelf 2 PSU1
2.1V DC+0mV-100mV
5V DC 250mV
3.3V DC +0mV-300mV
Test
2
AC Shelf 2 PSU2
2.1V DC+0mV-100mV
TEST
#
TEST LIMIT RESULT
Power Up and Self Test
AC Shelf 1
Alarms and
Indications
PSU 1
PSU 2
SC Card
AUX Cards (if
fitted)
Pass /Fail
Test
3
AC Shelf 2
Alarms and
Indications
PSU 1
PSU 2
SC Card
AUX Cards (if
fitted)
Rack ID