User's Manual
Table Of Contents
- Installation
- Overview AS4000
- Overview AS4020
- Preparation
- Rack Installation
- AS4000 AC Rack Cabling and Wiring
- AS4000 CT Shelf Cabling and Wiring
- _
- Expansion Rack Cabling
- Setup and Test
- System Testing
- AS4000 AC Setup and Test
- Access Concentrator: Turn-Up and DC measurements
- Setting Up the Access Concentrator
- _
- Setting the TEI and Baud Rate for Netspan Connection
- Creating AC Shelf/Rack on Sitespan
- Setting up AC Rack and Shelf configuration
- Configure AC Cards
- Configure AC Shelf properties
- Check Boot Sequence
- Alarm and Status Indications (Test 3)
- Self Test (Test 4)
- Test CTU cabling to the DDF E1 Cards
- Test CTU cabling to the Distribution Frame (DDF) GR303 Cards.
- Test XTU cabling to the DDF
- Connecting the AC to the Network
- Connect E1s/T1s to the Switch or Cross-Connect at the DDF
- Access Concentrator Rack Commissioning Test Results
- AS4000 CT Setup and Test
- AS4020 CT Setup and Test
- _
- General
- Repair and Return Procedure
- Repair Charges
- Return & Repair Tag
- Packing and Shipment
- Glossary
- Index
Setup and Test
99
2 Green Card busy LED, to indicate live traffic is present
and should not be removed.
OFF
SC
Position
Colour
Description Status
TOP
1
Red Card failure LED, which shall be alight if the card
self test fails
OFF
OK Card is Active.
PSU
Position Colour
Description Status
TOP 1 Red FUSE FAIL: Illuminated if either input fuse has
blown.
OFF
2 Green OK Card is Active. ON
3 Red I/P A FAIL input voltage A (BATTNEG0) not
present
OFF
4 Red I/P B FAIL input voltage B (BATTNEG1) not
present
OFF
5 Red O/P OVERLOAD. OFF
6 Red O/P UNDERLOAD OFF
Access Concentrator Shelf Card LED Indications.
Self Test (Test 4)
1. Select CTU card on shelf view double click the card, or click right mouse button and
select Airspan (card type) View
2. Execute the self test function (using Netspan) on each CTU card and ensure that it
passes. Replace any faulty cards.
Test CTU cabling to the DDF E1 Cards
1. Using Netspan create a CT rack with a dummy modem shelf.
2. From the Edit AC Shelf Properties screen assign E1-1 to the newly created CT shelf.
3. A red alarm should appear on the CTU card for the E1 activated.
4. Loopback TX to RX for the E1 (T1) at the DDF. Check that the alarm clears (the
amber remote alarm is lit for several seconds before clearing).
5. Reassign the CT shelf to E1-2, E1-3 and E1-4 in turn and repeat steps 3 and 4 (E1-5
to E1-8 for 120ohm connection).
6. Repeat steps 1 to 5 for CTUs in slots 5 and 6 if fitted.
Test CTU cabling to the Distribution Frame (DDF) GR303 Cards.