TEST TX OUTPUT POWER 2.0-2.3GHZ AND 2.3-2.5GHZ
BANDS
1. Test TX Output Power (Test 5)
Note: If adding a shelf and rack is in service omit this test
This section describes the measurement of TX output power. It involves powering
down and disconnecting the antenna. In existing installations this involves loss of
service to all users. Steps should be taken to minimise disruption if the rack has
existing users by completing the rest of the commissioning quickly.
1. Switch rack off by placing both breakers in the off position.
2. In existing installations disconnect antennas or in new installations remove the
load from the port to be tested. Connect Power Meter to the N-Type connector on
the coupler attached to the DIP/LNA at the top of the rack ready to measure the
power output from shelves 1 and 2, or to the N-type connector on the coupler
attached to the TX filter for shelves 3 and 4. The port not under test should be
terminated with a 15W termination.
POWER
METER
CT
15W termination if
the TX Filter is fitted
RF Power meter
connection when
measuring Modem
Shelves 1 & 2
TX Output Power
DIP/LNA1 TX Filter
15W
Termination
CT
RF Power meter
connection when
measuring Modem
Shelves 3 & 4
TX Output Power
DIP/LNA1 TX Filter
RF
Coupler
RF
Coupler
POWER
METER
Figure 35. Power Level measurement Test Set-up
3. Ensure that modems are not inserted in any shelf. Disconnect any modems that are
inserted by using the board extractor lever to unseat the board from the backplane
and sliding forward in the card guides. There is no need to completely remove the
modem from the shelf.