User Manual
AS4000 Central Terminal Installation and
Commissioning
DLP 010
605-0000-432
Issue 1.3a Date 18th October 1999
Page 1 of 8 Copyright Airspan Communications Corporation 1999
COMMISSIONING PROCESS FLOWCHARTS
The Charts below shows the commissioning and testing process. The reference in brackets is
the corresponding paragraph in the DLP. Tests are shown with a rounded corner box and
procedures are shown in a square box. In addition each test has a number indicating the order
of testing and reference for the test record sheets.
Commissioning racks for use with Sitespan