User Manual
AS4000 Release3 and Release 4 Central
Terminal Installation and Commissioning
DLP-006
605-0000-432
Issue 1.3a Date 18th October 1999
Page 3 of 4
2. 2Mbit/s Cabling 120Ω Twisted Pair
From the site survey, confirm the location of the Digital Distribution Frame (DDF).
The length of 2Mbit/s feeds from the rack to the DDF should not exceed 250 metres
Note: This must be a SELV port of an EN 60950 approved product.
Run the 2Mbit/s twisted pair cables from the modem shelf to the allocated positions on
the DDF. (Two cables per shelf if using screen twisted pair or one cable if using
screened four wire). In partial equipped installations it may be appropriate to run
enough cables to cater for a complete rack of equipment. Identify and label each cable
at both ends as well as the DDF positions.
Feed the cables through the top and down the front of the rack. Tie in cables as
necessary using suitable cable ties, trim, leaving no sharp edges.
Feed the cable through the hole on the side of the modem shelf to access the
backplane.
Fit Ferrites to each cable at the point of entry to the shelf. Secure a tie wrap each side
of the ferrite to keep it in place.
Terminate cables on 9 Way D-Type 2Mbit/s Out 6 & 7, 2Mbit/s In 2 & 3, Screen on 5
& 9. See Figure 20
2
3
5
9 Way Male (120
ohm)
6
7
9
2Mbit/s In
2Mbit/s Out
Screen
Screen if two cables
Figure 20. 120 balanced connections
For 120Ω balanced operation JP5, JP6 and JP7 should be removed. See Figure 21.
Fit the D-type connector to P1 on the Modem Shelf Backplane See Figure 21.