User Manual
AS4000 Operations and Maintenance
Section
605-0000-431
4
. Issue 1.6. Date3/2/99
DLP-004
Page 9 of 44 © Copyright Airspan Communications Corporation 1999
8. SC Red LED should now be extinguished and fault clear on alarm unit.
Note: All LEDs will be illuminated for 2 s during module boot-up. After
successful boot-up, the Fail LED will flash until the co-processor initialisation is
complete.
9. The new SC card will be downloaded with the shelf information from the Sitespan
.
10. Check that an alarm is received at the Sitespan by switching off one of the DC
input switches located on the combiner shelf. The three PSU fail lights will operate
and PSU fail messages will be sent to the Sitespan . Restore the switch and check
with the Sitespan to see if the messages are received and cleared.
STOP. THIS PROCEDURE HAS BEEN COMPLETED.