User Manual

AS4000 Operations and Maintenance
Section
605-0000-431
6
. Issue 1.6. Date3/2/99
DLP-019
Page 38 of 60 © Copyright Airspan Communications Corporation 1999
STEP PROCEDURE
STMON ST Programming
1. Ensure that the mounted CRU is facing in the general direction of the CT office
before commencing set-up and commissioning procedure.
2. Connect cable between Subscriber Terminal and PC as described in DLP-011.
3. From the DOS prompt start STMON by typing;
stmon
3. If the STMON panel shows a Com Time-out then;
a) Check cable connection
b) Check PC Com port selection and if necessary quit STMON by
pressing ESC and invoke using;
stmon /c com2
4. ST software build and channel codes are not displayed unless the ST is power
cycled after STMON is connected and invoked. If ST is not power cycled then it is
likely that the ST will not output STMON data - press F1 to request data.
5. Press F4 function key to install
6. Each CRU is initialised by entering a unique code. These codes are entered using
STMON and should be provided by the RF planning office on a form similar to that
shown in . A list of RF codes is provided at the end of this DLP.
Table 3 CRU Programming Information
RF *
2/3 digits
PN
1 digit
RW
2 digits
Identity
6 digits
Check N
o
.
1 digit
Remote site
location
1 0 6 1 0 1 000000 7 CRU1
*Note: Older CRUs will have a 2 digit RF code. Newer CRUs will have a
3 digit RF code.
7. The ST is programmed with the channel code, (e.g. 061010000007). Enter the ST
channel code by pressing the appropriate digits on the keyboard.
8. When complete wait for the ST to reboot. Check that the correct channel code is
displayed in the Build Status panel.