User Manual

AS4000 Central Terminal
Installation and Commissioning
DLP 011
605-0000-452
Issue 1.3dr Date 7/02/00
Page 2 of 6
RF Power meter connection
when measuring Modem
Shelves 1 & 2 TX Output
Power
CT
15W termination
if the 2nd DIP/LNA
or TX Filter
is fitted
POWER
METER
RF
Coupler
DIP/ DIP/LNA2
LNA1 TX Filter
POWER
METER
RF
Coupler
CT
Expansion
Rack
RF Power meter connection
when measuring Modem
Shelves 3 & 4 TX Output
Power
DIP/ DIP/LNA2
LNA1 TX Filter
Figure 33. Power Level measurement Test Set-Up
Measure the output of shelf 1. (this test is repeated for other installed shelves)
The following procedure must be followed:
1. Remove modem cards 2 – 5, leaving only one modem card, inserted in slot 10
2. Connect Sitespan to the shelf under test and set for commissioning. See DLP-010
3. Prior to commissioning the DTU properties should be set In the Edit DTU Properties
window set max net entry channels to 1, set the number of Free list entries at 160K
80K and 40K to 0. In the RW management window place the mouse pointer over the
IS for RW 1 click left mouse button until OOS is selected. Repeat for RW2 and RW3.