User Manual
AS4000 Central Terminal
Installation and Commissioning
DLP 005
605-0000-452
Issue 1.3dr Date 7/02/00
Page 6 of 10
PSU1
DTU
AU
PSU2
SC
Modem
Modem
Modem
Modem
Modem
Figure 23. Card installation for DA Modem Shelf
3. Card Provision for New Installation
STEP PROCEDURE
With the initial installation it is preferred to install the cards in both the combiner shelf
and the modem shelves with the power switched off.
1. Fit Cards in RF Combiner Shelf
a) For an installation of Combiner Rack
Insert the following modules and secure:-
• 1 RF Power Amplifier Module (2 PA’s) in the left hand position in the combiner
shelf
• 1 x Low Noise Amplifier + Diplexer (DIP/LNA 1) (Terminate output with
50ohm termination.)
• 2 x PSU’s
• 2 x Combiner Monitor Card (Monitor 1 303-043-900 & Monitor 2 303-043-
901)