User Manual
AS4000 Central Terminal
Installation and Commissioning
IXL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 3 of 8
2. Setting up CT Rack and Shelf configuration on Sitespan .........................................4
3. Assign Central terminal Card Slots ..........................................................................6
3.1. DTU Card...............................................................................................................6
4. Setting up AC Rack and Shelf configuration on Sitespan.........................................8
5. Assign Access Concentrator Card Slots.................................................................11
6. Configure AC Cards..............................................................................................12
6.1. CTU......................................................................................................................12
6.2. CAS......................................................................................................................12
6.3. DATA...................................................................................................................13
6.4. V5.1......................................................................................................................14
Shelf Controller Software Downloads ................................................................ DLP-009
1. Shelf Controller Software Downloads .....................................................................1
2. Alarm and Status Indications (Test 3)......................................................................4
3. Self Test (Test 4) ....................................................................................................8
4. System Soak ...........................................................................................................8
5. Preparation for Commissioning at the Central Terminal ...........................................8
Setting the receive sensitivity 2.0-2.3Mhz Band using DA Commissioning Unit
(DACU) DLP-010
1. Setting Up The DACU............................................................................................1
1.1. RF Interconnect ......................................................................................................2
1.2. Shelf Controller Communications............................................................................2
1.3. DC Connections......................................................................................................3
1.4. Connect Power Meter .............................................................................................3
1.5. Connect LAT Terminal ...........................................................................................4
2. Forcing the DA Commissioning Unit to acquire a link .............................................4
3. Rx Sensitivity..........................................................................................................4
4. Restoring shelf connections.....................................................................................6
Power Measurements and RX sensitivity ..........................................................DLP-011
Test TX Output Power (Test 5)......................................................................................1
Tools and equipment needed...........................................................................................1
1. CT Output Power....................................................................................................1
2. Rx Sensitivity (Test 6).............................................................................................4
Setting the system into service ............................................................................DLP-012
1. Set E1 link to Access Concentrator .........................................................................1
2. Set Sitespan to use direct Com................................................................................2
3. Reset Free list Entries..............................................................................................4
4. Check ST Acquisition..............................................................................................6
5. Remove Test Equipment .........................................................................................8
Commissioning Test Results ............................................................................... DLP-013
1. Commissioning Test Results....................................................................................1
1.1. Test Equipment Calibration.....................................................................................1