User Manual
AS4000 Central Terminal
Installation and Commissioning
DLP 014
605-0000-452
Issue 1.3dr Date 7/02/00
Page 1 of 6 © Copyright Airspan Communications Corporation 2000
SITE ACCEPTANCE
1. Site Inspection
Check all work areas are free of debris i.e. cable off-cuts, braid, dust and packaging and
that the site is as found.
2. Site Acceptance Forms
2.1. Purpose
ACC and customer copies of site acceptance forms are provided on the following
pages.