User Manual

AS4000 Central Terminal
Installation and Commissioning
DLP 012
605-0000-452
Issue 1.3dr Date 7/02/00
Page 3 of 8
3. Set connection to Indirect by checking the indirect box and set the Port to the com port
on the Sitespan PC connected to the Access concentrator Shelf.
4. View the Shelf Object List and check that Management Communications are connected
and ready. If software is still downloading wait for download to finish before
attempting any other Sitespan Operations. Check that there are no alarms on the shelf
ie Object text is black not red.