Installation Guide

AirSynergy Equipment Installation Guide
Page 6 Commercial in Confidence SYN-UG-007 Rev A0.41
Figure 27 Gently lift the AirSynergy body until the bottom studs engage in the bottom slots .......... 27
Figure 28 AirSynergy body engaged in the bottom slots ................................................................... 27
Figure 29 AirSynergy downtilt adjustment ......................................................................................... 28
Figure 30 Tighten flange nuts (4 positions) once the required mounting angle is set ....................... 28
Figure 31 AirSynergy attachment of earthing cable ........................................................................... 29
Figure 32 Attach earth cable to pole ................................................................................................... 29
Figure 33 Connecting the antenna RF cables .................................................................................. 31
Figure 34 AirSynergy Front mount antenna connections applying self -amalgamating tape ......... 31
Figure 35 AirSynergy antenna connections applying PVC tape .................................................... 32
Figure 36 Attach PoE drop cable to the AirSynergy .......................................................................... 32
Figure 37 Tools required to connect the PoE injector and PSU ........................................................ 33
Figure 38 AirSynergy power and network cable overview diagram ................................................... 35
Figure 39 Preparing the drop cable/network cable wire ends for connection into the PoE injector .. 35
Figure 40 Twist the individual drain wire strands together ................................................................ 36
Figure 41 Pass the network cable /drop cable end through the end cap of a PoE gland ................ 36
Figure 42 Pass the cable through the gland and tighten the end cap ............................................... 36
Figure 43 View of the PoE injector lid indicating the 4 cable gland positions .................................... 37
Figure 44 Position the individual pairs in the punch down strip ......................................................... 38
Figure 45 The punch down orientation .............................................................................................. 39
Figure 46 Continue dressing and punching down each coloured pair ............................................... 39
Figure 47 Push green/yellow plastic sleeves over the drain wire ...................................................... 40
Figure 48 Connect the drain wires to the earth terminal .................................................................... 40
Figure 49 Pass the d.c. power cable end through the end cap of a PoE gland................................ 41
Figure 50 Pass the d.c. power cable through the gland and tighten the end cap.............................. 41
Figure 51 Connect the red and black d.c. power wires into the terminal strip ................................... 42
Figure 52 The wired PoE injector box can be screwed into position ................................................. 42
Figure 53 Fit the top cover to the PoE injector box ........................................................................... 43