Installation Guide

AirSynergy Equipment Installation Guide
Page 6 Commercial in Confidence SYN-UG-007 Rev A0.41
Figure 27 – Gently lift the AirSynergy body until the bottom studs engage in the bottom slots .......... 27
Figure 28 – AirSynergy body engaged in the bottom slots ................................................................... 27
Figure 29 – AirSynergy downtilt adjustment ......................................................................................... 28
Figure 30 – Tighten flange nuts (4 positions) once the required mounting angle is set ....................... 28
Figure 31– AirSynergy attachment of earthing cable ........................................................................... 29
Figure 32– Attach earth cable to pole ................................................................................................... 29
Figure 33 – Connecting the antenna RF cables .................................................................................. 31
Figure 34 – AirSynergy Front mount antenna connections – applying self -amalgamating tape ......... 31
Figure 35 – AirSynergy antenna connections – applying PVC tape .................................................... 32
Figure 36 – Attach PoE drop cable to the AirSynergy .......................................................................... 32
Figure 37 – Tools required to connect the PoE injector and PSU ........................................................ 33
Figure 38 – AirSynergy power and network cable overview diagram ................................................... 35
Figure 39 – Preparing the drop cable/network cable wire ends for connection into the PoE injector .. 35
Figure 40 – Twist the individual drain wire strands together ................................................................ 36
Figure 41 – Pass the network cable /drop cable end through the end cap of a PoE gland ................ 36
Figure 42 – Pass the cable through the gland and tighten the end cap ............................................... 36
Figure 43 – View of the PoE injector lid indicating the 4 cable gland positions .................................... 37
Figure 44 – Position the individual pairs in the punch down strip ......................................................... 38
Figure 45 – The punch down orientation .............................................................................................. 39
Figure 46 – Continue dressing and punching down each coloured pair ............................................... 39
Figure 47 – Push green/yellow plastic sleeves over the drain wire ...................................................... 40
Figure 48 – Connect the drain wires to the earth terminal .................................................................... 40
Figure 49 – Pass the d.c. power cable end through the end cap of a PoE gland................................ 41
Figure 50 – Pass the d.c. power cable through the gland and tighten the end cap.............................. 41
Figure 51 – Connect the red and black d.c. power wires into the terminal strip ................................... 42
Figure 52 – The wired PoE injector box can be screwed into position ................................................. 42
Figure 53 – Fit the top cover to the PoE injector box ........................................................................... 43