Installation Guide

AirSynergy Equipment Installation Guide
Page 39 Commercial in Confidence SYN-UG-007 Rev A0.41
Note: The Punchdown tool will only fit one way round with the cutter blades
towards the centre of the box
Figure 45 – The punch down orientation
Figure 46 – Continue dressing and punching down each coloured pair
6.2.4 Continue dressing in and punching down the coloured pairs for the network and drop cables.
Take care to remove all cut-off wire ends from the box and trim off any ends that are not cleanly cut
by the punch down tool cutter.
Note: : If the protection earth wire (green/yellow stripe) obstructs the punch down
tool, then slacken the earth wire gland and pull it through into the box so that a
small loop is formed that can be moved away from the punchdown block. When
the punchdown work is completed then restore the earth wire to its original
position and re-tighten the gland.