6.2.2 The drop cable and network cables must be passed through the correct cable glands in the
PoE until 5mm of black outer sheath protrudes into the box. Tighten the gland end caps securely with
pliers taking care not to over tighten or damage the plastic.
The drop cable from the AirSynergy enters through the gland labelled on the box lid as “POE OUT”
and the network connection enters through the gland labelled “Network IN”. The correct orientation of
the lid can be checked by lining up the pre-attached earth wire with the gland labelled “Earth”.
Figure 43 View of the PoE injector lid indicating the 4 cable gland positions
6.2.3 Preparing the twisted pairs for punch down. Untwist enough of each colour coded twisted pair
of wire so that the individual wires can be laid into the punch down strips. The colour code must be
strictly followed and is marked on the PCB legend next to each punch down “slot”. Gently pushing the
wires into the slots with a small flat blade screwdriver will help to keep them in the correct position
before they are punched down with the punch down tool. The wires must be positions so that the
“flying “ end is towards the centre of the PoE box.