Installation Guide

AirSynergy Equipment Installation Guide
Page 36 Commercial in Confidence SYN-UG-007 Rev A0.41
6.2.1 With the drop cable from the AirSynergy cut to the required length strip back and remove the
outer sheath, foil shield and wrapping layer to a length of 6cm. Take care not to cut the insulation on
the inner twisted pairs or any strands of the drain wire. Repeat for the network connection cable.
Figure 40 Twist the individual drain wire strands together
Figure 41 Pass the network cable /drop cable end through the end cap of a PoE gland
Figure 42 Pass the cable through the gland and tighten the end cap