Installation Guide

AirSynergy Equipment Installation Guide
Page 36 Commercial in Confidence SYN-UG-007 Rev A0.41
6.2.1 With the drop cable from the AirSynergy cut to the required length strip back and remove the
outer sheath, foil shield and wrapping layer to a length of 6cm. Take care not to cut the insulation on
the inner twisted pairs or any strands of the drain wire. Repeat for the network connection cable.
Figure 40 – Twist the individual drain wire strands together
Figure 41 – Pass the network cable /drop cable end through the end cap of a PoE gland
Figure 42 – Pass the cable through the gland and tighten the end cap