Installation Guide

AirSynergy Equipment Installation Guide
Page 34 Commercial in Confidence SYN-UG-007 Rev A0.41
Note: It is good practice to leave a spare loop of drop cable (approximately 0.5m
of cable). This will allow for ease of wiring to the PoE and will allow the cable to
be re-terminated if necessary in the future.
6.1.2 The Network cable. The remaining section of cable with the RJ45 connector pre-fitted should
also be positioned to form the connection to a local network switch. (The length of this run should
be limited in length to 5m max.)
Note: It is good practice to leave a spare loop of network cable (approximately
0.5m of cable). This will allow for ease of wiring to the PoE and will allow the
cable to be re-terminated if necessary in the future.
6.1.3 If there is no planned Network connection at the installation site. It is recommended that a 1m
cable tail is connected to the PoE injector so that lap top computer or other test equipment can be
attached when required. When the installation is complete, the connector at the end of the tail should
be taped up with weather-proof tape and the wire neatly coiled and secured in a suitable space next
to the PoE injector. Add a label to identify which AirSynergy this network connection belongs to,
especially important where multiple AirSynergy units are installed on the same pole/tower.
Note: It is good practice to label the network connection cable to identify which
AirSynergy unit/PoE injector it is connected to. This is especially important where
multiple AirSynergy units are installed on the same pole/tower and the network
connection all converge on one Ethernet switch.