Isolate the mains supply and pass the mains cable through the input gland and terminate on the
connection blocks provided. The termination blocks are clearly labelled as Live, Neutral and Earth.
Once the enclosure top cover has been re-fitted (4 screw positions) and the PoE wiring completed the
mains power can be applied.
Safety - Disconnection of AC supply
Where Airsynergy is connected directly to building wiring a suitably rated and
readily accessible disconnect device shall be incorporated external to the equipment;
Where Airsynergy is connected to the ac mains supply using a plug and socket, the
socket-outlet shall be installed near the equipment and shall be easily accessible.