User's Manual

HiperMAX Masthead Equipment Installation Guide
Page 40 Commercial in Confidence UGD-D00093 Rev A.1
1. Run cable from the SCRT to the DC source breakers. (The DC source end is labelled SDR.)
2. Cut off the connector at the end labelled SDR. The picture below shows the SDR end.
Figure 25 HiperMAX-micro power connector cable termination
3. Connect to the 48VDC source distribution panel as shown in the table below:
4. Do not apply power to the SCRT until the commissioning stage.