User's Manual
HiperMAX Masthead Equipment Installation Guide
Page 11 Commercial in Confidence UGD-D00093 Rev A.1
1 About this Guide
This section discusses the purpose, intended audience, conventions, referenced documentation and
organisation for this guide.
1.1 Purpose
This guide provides the workflow and step-by-step procedures for Installation of the HiperMAX
masthead equipment. These procedures include:
Verify Prerequisites
Install the SCRT plate mount
Install the SCRT pole mount
Connect and manage cables
Connect to power system
1.2 Intended Audience
This guide is intended for persons who are responsible for installing the HiperMAX masthead
equipment. These persons should have a working knowledge of the HiperMAX masthead equipment.
1.3 Conventions
This document uses the following informational conventions.
Icon
Description
Checkpoint: Marks a point in the workflow where there may be an exit or branch
to some other procedure. At each Checkpoint the reason for an exit or branch is
given along with specific directions to locate the entry point in the other
procedure.
Reference: Gives a resource in the workflow that may be needed to complete a
procedure along with specific directions to use the resource.
Caution: Describes a possible risk and how to lessen or avoid the risk.
Advice: Provides a recommendation based on best practice.
Note: Provides useful information.