UGD-D00093 Rev A.1 HiperMAX Masthead Equipment Installation Guide Software Release 7.
HiperMAX Masthead Equipment Installation Guide This page intentionally left blank. Page 2 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide Acknowledgements Airspan Networks Inc acknowledges the following trademarks used within this document: © Intel Corporation http://www.intel.com/ © picoChip Designs Ltd http://www.picochip.com/ © Microsoft Corporation http://www.microsoft.com Copyright © Copyright by Airspan Networks Inc., 2008. All rights reserved worldwide.
HiperMAX Masthead Equipment Installation Guide Contact Information Customer Service Help-Desk for customer service emergency Airspan Networks have introduced the Airspan Tracker application to enable prompt and efficient Customer Support services. If you do not have an Airspan Tracker account, please obtain login credentials by filling-in the form in the main page at www.airspan.com/Support Register New Account.
HiperMAX Masthead Equipment Installation Guide Table of Contents Acknowledgements ................................................................................................................................. 3 Copyright ................................................................................................................................................. 3 Contact Information .......................................................................................................................
HiperMAX Masthead Equipment Installation Guide 5 Install the SCRT plate mount ........................................................................................................ 23 5.1 Mount the SCRT ................................................................................................................... 23 5.2 Verify Connection Torque Settings ....................................................................................... 24 6 Install SCRT pole mount ..........................
HiperMAX Masthead Equipment Installation Guide Summary of Figures Figure 1 – HiperMAX Hardware Components ...................................................................................... 13 Figure 2 – Workflow of HiperMAX SCRT Masthead Installation........................................................... 15 Figure 3 – HiperMAX-micro SCRT, Antenna, Mast Head Mounted ..................................................... 20 Figure 4 – HiperMAX-micro SCRT ...............................................
HiperMAX Masthead Equipment Installation Guide Figure 28 – HiperMAX secure fibre-optic cable, snug tie ..................................................................... 43 Figure 29 – HiperMAX secure fibre-optic cable, cut excess tie ............................................................ 43 Figure 30 – HiperMAX secure fibre-optic cable, use excess tie ........................................................... 44 Figure 31 – HiperMAX secure fibre-optic cable, re-use excess tie ...................
HiperMAX Masthead Equipment Installation Guide Summary of Tables Table 1 – HiperMAX-micro installation tools ......................................................................................... 18 Table 2 – HiperMAX-micro installation parts and kits ........................................................................... 18 Table 3 – HiperMAX-micro additional parts and kits .............................................................................
HiperMAX Masthead Equipment Installation Guide This page intentionally left blank. Page 10 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 1 About this Guide This section discusses the purpose, intended audience, conventions, referenced documentation and organisation for this guide. 1.1 Purpose This guide provides the workflow and step-by-step procedures for Installation of the HiperMAX masthead equipment. These procedures include: Verify Prerequisites Install the SCRT plate mount Install the SCRT pole mount Connect and manage cables Connect to power system 1.
HiperMAX Masthead Equipment Installation Guide 1.4 Referenced Documentation HiperMAX Hardware Configuration Guide Job Specification Lightning Protection Overview Airspan WiMAX Product Bulletin PB/ASM/2008/005 1.
HiperMAX Masthead Equipment Installation Guide 2 Introduction This section provides a descriptive overview of the product and its place in the product suite. 2.1 General Overview The Masthead subsystem is common to both HiperMAX and HiperMAX-Micro and comprises the Antenna, SCRT, Sunshield and Pole Mount Kit, as illustrated below. Figure 1 – HiperMAX Hardware Components 2.1.
HiperMAX Masthead Equipment Installation Guide This page intentionally left blank. Page 14 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 3 Get Started 3.1 Workflow of Installation The workflow required to install the HiperMAX-micro is shown in the following diagram: Figure 2 – Workflow of HiperMAX SCRT Masthead Installation Page 15 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 3.2 HiperMAX Installation Checklist Plan the installation of the HiperMAX ATCA by using the Installation Checklist, which you can find as a removable job aid in the Appendix of this document. Page 16 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 4 Verify Prerequisites 4.1 Verify Site Requirements [E.g., In normal operation, a separate server and client PC are required. The server and client may be located remotely from the equipment being managed.] 4.2 Verify Safety Requirements Read and follow all warning notices and instructions marked on the product or included in this manual.
HiperMAX Masthead Equipment Installation Guide 4.3 Verify Installation Requirements 4.3.1 Verify the Tools Tool Large Crosshead Screw driver Phillips # 3 or Pozidrive # 3 Small flat blade Screwdriver Medium Flat Bladed Screwdriver 13mm or 1/2 inch open ended Spanner 10mm or 13/32 inch open ended Spanner Wire strippers Wire cutters Ring terminals crimp tool RJ45 crimp tool Table 1 – HiperMAX-micro installation tools 4.3.
HiperMAX Masthead Equipment Installation Guide Installation Kit / Part: SCRT Installation Kit Mount per SCRT consisting of: Note: Connecting cables 1 x fibre 1 x power Available in lengths of 3, 10, 30 and 100 metres Table 3 – HiperMAX-micro additional parts and kits Optional Mounting Kits SCRT Installation Kit Pole Mount SCRT Installation Kit Wall Mount 4* M6X20mm Screws 4* M6x20mm Screws 4* M6 Flat Washers 4* M6 Flat Washers 4* M6 Spring Washers 4* M6 Spring Washers 1* Bracket (2Part) 1*
HiperMAX Masthead Equipment Installation Guide Installation Kit / Part Antenna / Feeder (not always provided by Airspan) Note Antenna and feeder Short feeder of 1 to 2 metres Table 6 – HiperMAX-micro antenna and feeder kits Additional items (not provided by Airspan) Cable ties Ring terminal for earth strap, M5 / M6 Earth strap cable (4 to 6 mm), yellow and green cable Table 7 – HiperMAX-micro additional items 4.3.
HiperMAX Masthead Equipment Installation Guide Figure 4 – HiperMAX-micro SCRT Page 21 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide This page intentionally left blank. Page 22 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 5 Install the SCRT plate mount 5.1 Mount the SCRT The SCRT is normally mounted on a pole (in close proximity to its external antenna if not using the SCRT mounted Antenna). Alternatively, there is provision for the SCRT to be mounted by screwing into the back through a metal mounting plate. The SCRT should be mounted so that the power and optic connectors are facing down.
HiperMAX Masthead Equipment Installation Guide Figure 7 – HiperMAX-micro SCRT termination panel 5.2 Verify Connection Torque Settings Connection Torque Setting Mains Connector and 48V Connectors 300N.cm OBSAI Connectors 100N.cm Table 8 – HiperMAX-micro connection torque settings Page 24 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 6 Install SCRT pole mount The SCRT can be used either with an antenna mounted on the SCRT or with a remotely attached RF antenna. Figure 8 – HiperMAX-micro SCRT and antenna pole mounted 6.1 Mount antenna to SCRT To mount the antenna to the SCRT, perform the following steps: 1. To attach the brackets to the rear of the antenna, fix the brackets to the studs with the nuts and washers provided. Page 25 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide Figure 9 – HiperMAX-micro antenna and mounting studs 2. Place the SCRT on a flat surface with the RF connector facing up as shown in image below. Figure 10 – HiperMAX-micro SCRT antenna bracket mounting holes 3. Place the antenna on top of the SCRT so that the RF connector on the antenna mates with the RF connector on the SCRT Caution: Do not over-tighten the RF connector. RF failures can result when the RF connector is over-tightened.
HiperMAX Masthead Equipment Installation Guide For a detailed description of the correct installation practices specific to the RF connector, please refer to Airspan WiMAX Product Bulletin PB/ASM/2008/005 available on the Airspan share methods site. Caution: Do not detach the antenna from the SCRT after the RF connector is connected. The RF connector can be damaged if the antenna is detached from the SCRT after the RF connector is connected. 4.
HiperMAX Masthead Equipment Installation Guide 5. Use a Pozi-drive screwdriver and the screws provided to secure the brackets to the SCRT. Figure 12 – HiperMAX-micro secure SCRT antenna bracket 6. Apply electrical tape to the weather-exposed RF connector. Figure 13 – HiperMAX-micro SCRT antenna tape RF connection Page 28 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 7. Ensure the RF connector is completely sealed from the weather. Figure 14 – HiperMAX-micro SCRT antenna seal RF connection 8. Carefully turn the assembled SCRT and antenna unit so it rests flat on the antenna face with the SCRT air baffles facing up as shown below. Figure 15 – HiperMAX-micro SCRT antenna assembled unit Page 29 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 9. Use the four (4) M6 screws to fix the sun shield to the SCRT. Figure 16 – HiperMAX-micro SCRT attach sun shield 6.2 Mount SCRT and Antenna to pole 1. Fix the flanges of the pole mount bracket to the sun shield as shown below. Figure 17 – HiperMAX-micro SCRT attach pole-mount bracket to SCRT Page 30 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 2. Use the two U bolts nuts, flat washers and spring washers to fix the other half of the pole mount bracket to the pole as shown below. Figure 18 – HiperMAX-micro SCRT attach pole mount bracket to pole 3. Join together the two halves of the bracket and clamp with the nut, bolt, and locking washers provided. The part of the bracket connected to the SCRT is designed to locate in the head of the bolt and stop it rotating.
HiperMAX Masthead Equipment Installation Guide Figure 20 – HiperMAX-micro SCRT and antenna attached to pole mount 4. Connect the ground braid to the earth point on the termination panel of the SCRT as shown below. Figure 21 – HiperMAX-micro SCRT attach earth braid to SCRT Page 32 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 5. Connect the earth braid to the pole using the TK series clamp as shown in the diagram below. Figure 22 – HiperMAX-micro SCRT attach earth braid to pole Page 33 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide This page intentionally left blank. Page 34 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 7 Connect and Manage Cables 7.1 Connect HiperMAX 1. Run the cable from the Antenna to the GPS Shelf and attach to the GPS Antenna port and attach to the GPS Antenna. 2. Neatly tie any excess cable (see Secure Fibre-optic Cable in the Appendix for this guide). 7.2 Connect Optic interface for HiperMAX-micro Each SCRT is provided with a 3 metre optical fibre cable, ready terminated with optical connectors.
HiperMAX Masthead Equipment Installation Guide d) Antenna installation should be avoided in close proximity with other receivers or transmitters likely to cause interference. e) The antenna should be positioned to minimise the risk of a lightning strike. See Lightning Protection Overview for guidance on placement. f) The antenna should be placed within 4 metres of the SDR-micro. 7.4.
HiperMAX Masthead Equipment Installation Guide Figure 23 – HiperMAX GPS antenna bracket 1. The RJ58 antenna cable is provided with a TNC connector attached at each end. Run the cable from the SDR-micro or HiperMAX GPS receiver to the location of the GPS antenna. 2. Thread the TNC connector cable through the threaded tube on the bracket and attach the TNC connector to the Antenna. 3.
HiperMAX Masthead Equipment Installation Guide This interface is used to provide 10MHz clock between a HiperMAX-micro master SDR and a HiperMAX-micro slave SDR. A 1.5 metre connecting cable (terminated at both ends with TNC connectors) is provided with a slave BS. 7.7 Connect Optic Interface to SCRT Each SCRT is provided with various metre optical fibre cable, ready terminated with optical connectors. Unscrew the protective dust cap and screw the fibre optic cable in place. 1.
HiperMAX Masthead Equipment Installation Guide 8 Connect to Power System Hazardous voltage! Before working, ensure that the power is removed from the power connection cables. When the system is powered on, do not touch the power terminals. 8.1 Power Output to SCRT Each SCRT is provided with various lengths 48 volt power cable terminated with a male connector at one end and a female connector at the other. Warning: The male connector attaches to the SDR and the female connector attaches to the SCRT.
HiperMAX Masthead Equipment Installation Guide 1. Run cable from the SCRT to the DC source breakers. (The DC source end is labelled SDR.) 2. Cut off the connector at the end labelled SDR. The picture below shows the SDR end. Figure 25 – HiperMAX-micro power connector cable termination 3. Connect to the 48VDC source distribution panel as shown in the table below: 4. Do not apply power to the SCRT until the commissioning stage. Page 40 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 9 Appendix A 9.1 Review Job Sheet The Job Sheet should include the following information: BS location and ATCA rack identity. Whether the system is required to be locked to a GPS timing reference. Whether the SDR is to be a Primary Master, Secondary Master or a Slave. This information will be mapped to the ATCA rack slot number by this procedure. A BSID is required for each SDR Blade.
HiperMAX Masthead Equipment Installation Guide Read Write Community: This should be specified to the same value as in Netpans Discovery Parameters (found under "Server" on Netspans left hand panel). SNMP Port Number: This should be specified to the same value as in Netpans Discovery Parameters (found under "Server" on Netspans left hand panel). IP Address: This specifies Netspans IP address (found under Server Global Configuration, which is under Server on Netspans left hand panel).
HiperMAX Masthead Equipment Installation Guide Figure 27 – HiperMAX secure fibre-optic cable, pull tie 3. Release the tension when snug, then cut and remove any excess strip. Always cut through the square sections, not the wider cells. Figure 28 – HiperMAX secure fibre-optic cable, snug tie Millie-Tie is efficient, and simply gets a little shorter after each use. The remaining strip can be kept and reused. Figure 29 – HiperMAX secure fibre-optic cable, cut excess tie 4. Repeat these steps for each use.
HiperMAX Masthead Equipment Installation Guide Figure 30 – HiperMAX secure fibre-optic cable, use excess tie Figure 31 – HiperMAX secure fibre-optic cable, re-use excess tie Page 44 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 10 Appendix B – Troubleshooting TBD [‘WiMAX Product’] troubleshooting.
HiperMAX Masthead Equipment Installation Guide This page intentionally left blank. Page 46 Commercial in Confidence UGD-D00093 Rev A.
HiperMAX Masthead Equipment Installation Guide 11 Appendix C – Glossary of Terms AAA Authentication, Authorization and Accounting AAS Advanced Antenna System AF Application Function ARQ Automatic Repeat reQuest ASN Access Service Network ASN GW ASN Gateway ATCA Advanced Telecommunications Computing Architecture BS Base Station BWA Broadband Wireless Access CHAP Challenge Handshake Authentication Protocol CPE Customer Premises Equipment CQI Channel Quality Indicator CSN Connectivity
HiperMAX Masthead Equipment Installation Guide NLOS Non Line of Sight NSP Network Service Provider NWG Network Working Group OBSAI Open Base Station Standard Initiative OFDMA Orthogonal Frequency Division Multiplexing (Multiple Access) PA Paging Agent PAAA Proxy AAA PC Paging Controller PF Policy Function PHY PHYsical Layer PMIP Proxy MIP PPP Point-to-Point Protocol RADIUS Remote Authentication Dial In User Service RRA Radio Resource Agent RRC Radio Resource Controller RRM Ra
HiperMAX Masthead Equipment Installation Guide 12 Appendix D – Checklist The Checklist below gives the high-level steps in the Workflow for this procedure. Detach or print this page to use as a job-aid for completing the actions this procedure requires. Procedure Actions Outcome 1. Verify Prerequisites 1.1 Verify site requirements All requirements are in place for a successful installation or upgrade to new version of Netspan. 1.2 Verify safety requirements 1.3 Verify installation requirements 2.
HiperMAX Masthead Equipment Installation Guide This page intentionally left blank. Page 50 Commercial in Confidence UGD-D00093 Rev A.