Manual
AirSep
®
Corporation
NewLife
®
Elite Service Manual
5.11.2 ON/OFF Power Switch Installation 5-15
5.12 Buzzer Replacement 5-15
5.13 Hour Meter Replacement 5-15
5.14 Flowmeter Replacement 5-16
5.14.1 Flowmeter Removal 5-16
5.14.2 Flowmeter Installation 5-16
5.15 Power Cord Replacement 5-16
Section 6.0
Troubleshooting
6.1 Operating Pressure Test 6-1
6.1.1 High Operating Pressure 6-1
6.1.2 Low Operating Pressure 6-2
6.2 General Troubleshooting 6-2
6.3 Troubleshooting Chart 6-4
6.4 Tool Kit and Pressure Test Gauge 6-7
Appendix
Exploded
Drawings
Figure 1: Control Panel Assembly A-1
Figure 2: Main Structure Assembly A-2
Figure 3: Base and Cabinet Components A-3
Figure 4: Test Block Assembly A-4
Figure 5: Valve Block Assembly A-5
Figure 6: Compressor Assembly A-6
Figure 7: Adsorption Bed Assembly A-7
iii – table of contents