Natural Gas to Propane Conversion Instructions

AG--KC019SNP--02 5
Specifications subject to change wi thout notice.
Modulating Gas
V
alve
A190115
A190116
INSTALL ORIFICES
1. Install main burner orifices. Do not use PTFE thread--seal
tape. Finger--tighten orifices at least one full turn to
prevent cross--threading, then tighten with wrench.
2. There are enough orifices in each kit for largest furnace.
Discard extra orifices.
NOTE:DO NOT reinstall the manifold at this time.
INSTALL MIXER SCREWS
NOTE:“REQUIRED FOR THE CONVERSION OF
CONDENSING GAS FURNACES TO P ROPANE GAS”
1. See Figure 6 to verify you have the correct set of mixer
screws.
2. Locate the dimple on each burner venturi tube.
3. If you cannot locate the dimple, refer to Figure 7 for
location of the mixer screw.
4. Drill a 7/64 --in (2.8 mm) hole (supplied in kit) in each
dimple.
5. Install a mixer screw in each drilled hole drilling as straight
as possible (i.e. in the center of the gas flow stream as
well as perpendicular to the gas flow stream).
6. The screw head should be flush with the top of the burner
venturi.
Figure 6 Gas Conversion Kit
A11294