Specifications

Airmux-200 Ver. 1.750 Site Requirements and Prerequisites 2-1
Chapter 2
Installation and Setup
2.1 Introduction
This section describes the installation, alignment, and setup procedures for an
Airmux-200 system.
After installing the hardware and establishing a link, refer to
Chapter 3
for
operation instructions and
Chapter 4
for configuration instructions.
In case a problem is encountered, refer to
Chapter 5
for test and diagnostic
instructions.
Internal settings, adjustment, maintenance, and repairs may be performed only
by a skilled technician who is aware of the hazards involved.
Always observe standard safety precautions during installation, operation, and
maintenance of this product.
Before installing the product, review
Handling Energized Products
at the
beginning of the manual.
2.2 Site Requirements and Prerequisites
For the IDU units, allow at least 90 cm (36 in) of frontal clearance for operating
and maintenance -Libility. Allow at least 10 cm (4 in) clearance at the rear of the
unit for signal lines and interface cables.
The ambient operating temperature should be –45
° to 60°C (–49° to 140°F)
(ODU), or –5
° to 45°C (23° to 113°F) (IDU) at a relative humidity of up to 90%,
non-condensing.
Warning
Note