Specifications

Quick Start Guide Installation and Operation Manual
4 Installing the Airmux-200 Units Airmux-200 Ver. 1.750
Three beeps and a pause is the best signal
Two beeps and a pause, signal quality increased
One beep and pause is no signal change
Any other signal detects no signal between ODUs.
8. Secure the site B ODU to the mast/wall.
9. At site A, adjust the ODU slowly while listening to the beeper sequence until
the best signal is attained.
10. Secure the site A ODU to the mast/wall.
11. Monitor the link quality for about 15 minutes to verify stability.
12. Connect the management station to one of the two IDUs in the link.
13. Double-click the Airmux-200 Manager icon to start the application.
14. Click the Installation button to open the installation wizard and follow the
installation steps.
After selection of the radio channel and the link rate (as determined in the Link
Budget Calculator utility), verify that the link quality bar in the Airmux-200
manager is within the green range for TDM service and within the yellow range
for Ethernet service.
Achieve the best possible link quality values. In case of radio link loss, verify the
ODU alignment, or change the radio channel in both sides of the link. When the
radio link resumes, continue the installation process.
To install the Outdoor PoE (O-PoE):
1. Route the ODU cable from the ODU location (on the roof) to the O-PoE
location (also on the roof). The maximum combined length of the ODU to
Outdoor PoE cable and the O-PoE to user hub/router (or any other
compatible device) cable is 100m.
2. Mount the O-PoE unit to the mast or wall, using the mounting kit and
mounting instructions.
3. Verify that the O-PoE mounting brackets are connected to ground.
4. Connect the O-PoE chassis to ground.
5. Route the O-PoE AC cable along the mast or wall to a protected/shielded AC
outlet.
Note
Note