Specifications
Installation and Operation Manual Quick Start Guide
Airmux-200 Ver. 1.750 Installing the Airmux-200 Units 3
To align the ODU:
1. Connect power to the site A IDU.
After approximately 20 seconds the ODU beeper starts beeping. This is
normal.
2. Verify normal operation of the IDU by the LED indications on the front panel.
Indicator Color Status
PWR Green ON
IDU Orange
Green
ON for short duration during startup
ON during normal operation
ODU Green ON shows normal operation
AIR I/F Orange
Green
ON for short duration during startup
ON shows normal operation
SERVICE Green ON shows normal operation
OFF when Service is configured for Ethernet only
Do not stand in front of a live outdoor unit, see
Appendix H
.
3. Align the site A ODU in the direction of the site B ODU.
4. Connect power to the site B IDU.
After approximately 20 seconds the ODU beeper starts beeping. This is
normal.
5. Verify normal operation of the IDU by the LED indications on the panel.
Indicator Color Status
PWR Green ON IDU-E only
IDU Orange
Green
ON for short duration during startup
ON during normal operation
ODU Green ON shows normal operation
AIR I/F Orange
Green
ON for short duration during startup
ON shows normal operation
SERVICE Green ON shows normal operation
OFF when Service is configured for Ethernet only
6. Make an azimuth sweep with the site B ODU of 180 degrees so that the site
A ODU position is learned by the site B ODU.
7. Turn the site B ODU slowly back towards the site A direction, listening to the
beep sequence until optimal alignment is achieved.
Caution