Installation guide
Sparrow Mk4 Installation Guide 20
th
Dec 2012 Page 6 of 14
1. INSTALLATION POSITION
Fig 1: Sparrow Mk4 clearances required around roof top unit
Before beginning, mark out the position of the unit
considering the following important requirements:
- The air conditioner should be situated as
centrally as possible on the van, to ensure even air
distribution.
- The Sparrow Mk4 may be oriented in any
direction to the normal direction of travel
- When considering the installation position
remember to check for clearance around the
plenum inside the van.
- Avoid an installation position where a bulkhead,
cupboard or light fitting could interfere with the
discharge air flow from the plenum.
- Avoid an installation where a roof joining seam
crosses through the 14” square installation cut
out.
It is important that the unit is never
more than 5° from the horizontal and the
rear of the unit should never be higher
than the front when in use.
- Contact Aircommand if your installation differs
significantly
Fig 2: The foot print of the rooftop unit, and the plenum, measured from the hole
- The above outline on the left shows the minimum clearance required around the
Sparrow Mk4 unit on the roof of the vehicle, distances shown are calculated from a
14” square hole (356 x 356mm)
- The above outline on the right shows the minimum clearance required around
the Plenum located on the ceiling inside the vehicle, distances shown are
calculated from a 14” square hole (356 x 356mm)
Minimum 100mm clearance
around the perimeter of the unit
to allow for service access and air
flow to condenser.
Hot air is ejected from this
exhaust; consider nearby
roof hatch
14” x 14”
(356mm)
SQUARE
HOLE