Specifications

14
Start-Up Procedure
At any point during the process of startup or shutdown, you notice anything unusual; we recommend you
refertotheoperationmanualimmediately.Ifyoucannotfindtheanswerinthetroubleshootingsection,
contact your Aircel representative or the factory at once.
1. Ensurethatthedryerisconnectedtoa
suitablecompressedairsupply.Makesure
that the pressure of the supply is equal to
the normal operating pressure of the dryer.
2. Checktomakesurethe“shut-off’valves
are closed and that by-pass valve is open.
3. Close all manual drain/vent valves.
4. Slowlypressurizethedryerbygradually
(slowly)openingtheinletshut-offvalveto
theOPENposition.
5. Whenbothtowersofthedryerare
completelypressurized,checkthecomplete
systemforpossibleairleaks.Usesoap
and water to test all joints and fittings.
Ifanyleaksaredetected,immediately
depressurizetheunitandcorrecttheleaks.
6. Makecertainthatanyautomatic
condensate drain isolation valves are in
the open position so proper condensate
draining can occur.
7. Whennormaloperatingpressureis
reached,switchonelectricalpower(Turn
switchtoONposition)
8. With by-pass valve closed, open the outlet
valve slowly to allow air downstream.
9. When energized one of the towers should
depressurize.
10.Checktheoperationofseveralcycles
completely by following the control panel
display screen operation, the panel lights
ontheelectricalbox,andthetower
pressuregaugestomakecertainthedryer
system is operating as displayed. Also
refertothehowitworkssection,flow
diagram, electrical drawing, dryer control
display screen descriptions, and sequence of
operation in this manual for reference.
11.Checkthedrainvalveforproperoperation
anddischargeofliquid(filtersand
separators,etc.).
12.Nearthedryeroutlet(APV)valve,check
the control air/ pilot air regulator secondary
pressure, the regulator gauge should read
100psig.Increaseordecreaseregulator
knobtoachievea100psigcontrolair
secondary pressure reading.
13.Makecertainthepurgeexhaustvalves
slowlyopenwithinan8to12secondtime
period, some adjustment of the flow control
valve attached to the actuator may be
required, after adjustment tighten down the
lockingcollar.
14.Makecertainaslightamountofairflow
isfeltattheendoftheEMSRHsensor
samplecellexhaustcoiltube(thisis
normallylocatedatthebackofthedryer)
adjust the needle valve to give more or less
flow.
15.Reviewthedryersystemdisplayscreen
shots(inthismanual)tomakecertain
the parameters are set as needed in the
customer dryer.
16.Purgeairflowispresetandnotadjustable.
After the initial startup, the dryer operation is completely automatic. To understand the details of the
operation,werecommendyouusethehowitworkssection,flowdiagram,electricaldrawing,dryercontrol
display screen descriptions, and sequence of operation in this manual for reference.
AircelAHLDE-Series-Models1000-5000