Specifications

12
Installation
Pre-requisites for Installation
To ensure a safe and smooth installation, we recommend you go through the steps indicated below:
• MakesurethatallpersonnelinvolvedhavereadthisOperationManualthoroughly.Ifyouhave
any questions, feel free to contact your Aircel representative or the factory and we will be glad
toassistyou.Ifyouneedhelpwiththecommissioning,wewillbegladtoscheduleafactory
serviceman to visit your site and commission the dryer for a nominal fee.
• HaveextracopiesoftheOperationManuals.
• Specialcaremustbetakenwhiletransportingtheunittotheinstallationsite.
• Dryermustnotbemovedorliftedbytheattachedpiping.
Location
• Carefulconsiderationshouldbegiventothelocationofthedryerinordertoassureoptimum
results. Ensure that the load bearing weight of the floor is adequate for the weight of the dryer.
• Thedryershouldbelocatedinanopenareaandalevelground.Dryershouldbeboltedtothefloor
to eliminate vibrations.
• Theambienttemperatureshouldbebetween40°Fand100°F.Lowtemperaturecouldaffectthe
dryer process and result in high outlet dew point.
• Inconditionswheretheambientdropsbelowfreezing,Aircelrecommendstheuseofheattraceon
any coalescing filter sumps and drain lines and the use of heated type drains.
• Dryerandaccompanyingfiltersshouldbeinstalledwithatleast2-5feetclearancefromthe
adjoining walls to provide easy access for routine maintenance.
TypicalInstallation
AircelAHLDE-Series-Models1000-5000