User`s manual
PPOOWWEERR SSWWIITTCCHH ((AAmmbbeerr))
When the POWER switch is
turned ON it will illuminate,
indicating that there is power to
the processor and the heating
system is on. Turn the POWER
switch OFF at the end of the
day. See Fig. 6A.
TTEEMMPPEERRAATTUURREE RREEAADDYY
LLIIGGHHTT((GGrreeeenn)) // PPRROOCCEESSSS
SSWWIITTCCHH
.
When chemistry reaches its fac-
tory pre-set processing temper-
ature of 75°F, the
RREEAADDYY
light
flashes, then remains steady,
indicating that chemistry is at
processing temperature.
Processing is initiated by turn-
ing the
PPRROOCCEESSSS
switch
OONN
.
After processing, the
PPRROOC
CEESSSS
switch is turned
OOFFFF
. The Peri-
Pro remains ready to process
film as long as the
PPOOWWEERR
switch is left in the
OONN
position
and the green
RREEAADDYY
light is
illuminated. See Fig. 6B
RREEFFIILLLL AACCCCEESSSS DDOOOORR
Open the refill access door
when changing and refilling
water, and to check chemistry
levels at the start of the day.
This door must be closed when
processing film. It is closed
when it latches, or snaps, shut.
See Fig. 1 & 5.
FFIILLMM IINNLLEETT SSHHUUTTTTEERR
When the shutter is slid to the
right, it latches in place. Films
drop into the transport and
begin processing automatically
when the transport arms move
into position and the shutter
opens. New batches of film can
be processed every 55 seconds.
5
FIG. 6
FIG. 7
A
B
POWER
READY WHEN LIT
PROCESS
22.. AAsssseemmbbllee PPrroocceessssoorr
Lower the film transport straight into the tanks. The
film transport must sit squarely on the cutouts found
on the top of the vertical plates to the left and right
side of the tanks.
Note: The Transport locks the thermistor into place.
Install the film inlet grill on top of the film transport.
Note that it installs one way: track 1 to the rear and
track 8 to the front of the processor.
Remove the water drain tube from the clips that
hold it to the perimeter of the processor base and push one end of this tube onto the hose
barb part of the drain valve at the right end of the processor. Place the other end of the drain
tube into a receptacle large enough (at least 45 oz.) to hold the contents of the water tank
when it is drained.
Install the processor cover onto the base with
the refill access door in front.
Snap the film dividers (optional installation) into place in the
film delivery receptacle. Hang the film delivery receptacle on
the cutout at the dryer end of the cover.
Plug the line cord into a 115V outlet.
33.. CChheecckk OOppeerraattiioonn ooff RReeffiillll AAcccceessss DDoooorr
Open the refill access door by firmly pinching the two tabs,
then pulling the door open. There will be some resistance.
Close the panel by pushing it in until it latches (snaps) shut.
OPERATION
OPERATOR CONTROLS
INSTALLATION
FIG. 4
FIG
. 5