Operating instructions
PERMANENTWIRING
To
permanently
wire the C-12
follow these instructions
exactly. All wlring
must comply with applicable
codes and
ordinances. Wire
the C-12
using the
built-in
iunction
box
as
indicated in
lig.7 The
power
source
must
be
l2O volt,
60
Hz.
It
is
recommended
that No. 14 or
heavier wire be used
to
complete
the wiring
from the
junction
box
to the
external
power
source.
However,
be sure
to
comply
with local codes.
l. Open
C-12
junction
box
cover
(Fig.7).
2.
Disconnect and discard
the
power
cord, the
solderless connectors and strain
relief. PIug
the
power
cord hole
with the
plug
provided.
3.
Run conduit
lrom
power
supply
to
junction
box
through
the appropriate
knockout.
Fish wires
to
iunction
box.
4 . Connect
Iead
wires with
solderless
connectors
including
ground
(green)
wires. Proper
grounding
ol
this device
is mandatory
lor correct
operation
and
salety.
5.
Insert hole
plug
in hole
where
power
cord
was removed.
SO! D€
RLLSS
!O\llfCTORS
FIG.7-REMOVE
THE
JUNCTION
BOX COVER
TO
GAIN
ACCESS
TO
THE POWER SUPPLY
CONNECTIONS.
ii\
CHECKOUT
Before
leaving
the
installation,
check
to be
sure
that
the Ol2
is
properly
installed
and operates
correctly.
MOUNTING
o
The Cl2
is securely
fastened to
the ceiling
or
wall'
6
lt is mounted
wher€
it will not
interfere
with
normal
occupant
traffic.
tr Unit
is
properly
oriented
for
good
air
circulation.
ASSEMBLY
O
Elestronic
cells
are cor€stly
orientd-airflow
arrows
pointing
toward
blower.
El
hefilter
screGns
proporly
instalhd.
OPERATION
O
Fan
runs correctly
in all
speed
settings.
o
SYSTEM
light
turns on
when
fan is
running.
O
Opening
acoess door
stop6
fan
and turns
out
the
system
light.
NOTE:
If the
Ctz does
not
apPear to
work
right,
refer to
ELECTRICAL
TROUBLESHOOTING'
CLEANUP
tr
Clean
the
outside
surfac€s
of
the
air cleaner.
CJ
Oean
up
the installation
area.
10