User's Manual
9
f Conrm zeroing by ring at least three shots at a zeroing target.
Check points of impact to conrm accuracy and repeat above
procedure if required.
g After initial ring, ensure that the sight with mount is securely
installed on the weapon.
e Windage adjustments (See Fig. 3)
– To move the point of impact to the right, turn Windage
adjustment screw (5) counter clockwise.
– To move the point of impact to the left, turn Windage
adjustment screw (5) clockwise.
Elevation adjustments (See Fig. 4)
– To move the point of impact up, turn Elevation adjustment
screw (4) counter clockwise.
– To move the point of impact down, turn Elevation adjustment
screw (4) clockwise.
NOTE: Each click of the Adjustment screws (4) (5) corresponds to
a 13 mm movement of the point of impact at 100 meters, (3 mm at
25 meters and 26 mm at 200 meters or 0.5 in at 100 yds).
Fig. 3 Windage adjustments Fig. 4 Elevation adjustments










