Technical data
Testing U4154A Performance 3
U4154A Logic Analyzer Service Guide 29
strip, and the center conductors of each SMA
connector.
b Ensure that there is continuity between each of the
two pins on the right side of the pin strip, and the
SMA connector frames.
c Ensure that there is NO continuity between the SMA
connector center conductor and the SMA connector
frame (ground).
5 Finish creating the test connectors:
a Attach an SMA m- m adapter to one end of each of the
four SMA/Flying Lead test connectors.
b Attach a 50 ohm terminator to the other end of two of
the SMA/Flying Lead test connectors.