Specifications
2 Performance Verification
12 Series N6700 Service Guide
Verification Test Set-up
The following figures show the verification test set-ups. Connect all
leads to the output terminals as shown in the following figure. Twist
the + and - load leads to reduce noise and inductance.
NOTE
Load lead lengths for models N678xA SMU must be between 1 and 4 feet.
A.
DC voltmeter,
scope, or
rms voltmeter
+S + -S
+
+S + -S
B.
Current
shunt
+S + -S
+
DC voltmeter
+
Electronic load
or resistor
D.
+S + -S
+
Agilent 3458A
configured as
an ammeter
Electronic load,
fixed resistor,
or N6782A in
CC load mode
+
RC network - for
N678xA transient
response test only.
+
DC voltmeter
E.
+
External DC
power supply
Aux Meas
+
Aux Meas
-
+
DC voltmeter
F.
+
Electronic load
- - G
+ +
+s G -s
sense jumpers
External
DC supply
Current
monitor
+S + -S
+
G.
+
DC voltmeter
+
Differential
amplifier
Scope or
rms voltmeter
50 50
output
50 ohm
termination
input
BNC
BNC
BNC
C.
+
Electronic
load or
resistor