User manual
Operating Procedures 4
N9360A Multi UE Tester GSM User Manual 4-29
Step 18
As each step is running in the test flow, its corresponding test
item field in the table is highlighted. While the RF Test step is
blinking, each of the measurement items is measured. So, you
can see how it is being done.
Step 19
At the MS Release step, press the On Hook button on the mobile
phone to finish the call.
Step 20
At the BS Call step, press the Off Hook button on the mobile phone
to respond to the call from the Tester.
Step 21
If the sequence 2 is set on the [Configuration: Test Sequence]
screen, the sequence 2 is executed automatically after the BS
Release step in the sequence 1 is completed. The test goes on in
the same way as sequence 1.
Step 22
After the measurement is completed, a [Stand-by] summary
screen is displayed to show the test results.