User manual

Operating Procedure 4
N9360A Multi UE Tester CDMA2000 User Manual 4-51
14
Press the Start softkey to start a test. A screen status changes
from Stand-by to Measuring.
15 Turn the mobile phone on. Wait for the mobile phone to camp
on, and P is shown at the UATI Assignment step.
16 At the BS Call step, , the mobile phone automatically
responds to the call from the Tester. When connected, P is
shown at the BS Call step.
17 As each step is running in the test flow, its corresponding
test item field in the table is highlighted. While the RF Test
step is highlighted, each of the measurement items is
measured. So, you can see how it is being done.
18 At the Softer Handoff step, handover from PCS US to Cel US. A
screen status changes to Sequence 2.
19 After the measurement is completed, a [Stand-by] value
screen is displayed to show the test results.
Figure 4-41 [Automatic Test: Stand-by] Value Screen