Technical data

4 Notes on USB Electrical Compliance Testing
In This Book
This manual contains notes on the electrical tests that are performed by
the USB 2.0 compliance test option; it describes the equipment used, and
it describes how the tests are performed.
Chapter 1, “Installing the USB 2.0 Compliance Test Option” shows how
to install and license the automated test application software (if it was
purchased separately).
Chapter 2, “Preparing to Take Measurements” describes the equipment
required, how to set up the equipment, how to start the USB 2.0
Compliance Test Option, and how to run tests.
Chapter 3, “Device Hi- Speed Tests” describes the equipment used for
each test setup.
Chapter 4, “Hub Hi- Speed Tests” describes the equipment used for each
test setup.
Chapter 5, “Host Hi- Speed Electrical Tests” describes the equipment
used for each test setup.
Chapter 6, “Troubleshooting Hi- Speed Test Failures” describes the
Debug Mode options that can be used when troubleshooting hi- speed
test failures.
Chapter 7, “Low and Full Speed Tests” describes the equipment used
for each test setup.
Chapter 8, “On- The- Go Electrical Tests” describes the equipment used
for the test setup.
See Also
The USB 2.0 Compliance Test Option’s online help, which describes:
Creating or opening a test project.
Selecting tests.
Configuring selected tests.
Connecting the oscilloscope to the DUT.
Running tests.
Viewing test results.
Viewing/printing the HTML test report.
Saving test projects.
The USB 2.0 developers documents are available at the USB
Implementers Forum web site, http://www.usb.org/developers/docs. This
web page has test procedure documents for the E2683A USB 2.0
Compliance Test Option, which contain test records used for compliance
test submission.