Technical data

110 Notes on USB Electrical Compliance Testing
4 Hub Hi-Speed Tests
3 Check I have completed these instructions.
EL_48 Measure Hub Downstream Delay
EL_42 EL_43 Measure Truncated Bits from Repeated SYNC Field
EL_44 EL_45 Measure Repeated EOP Width
Viewing Test Results
1 When the Testing Complete dialog appears, click OK.
The Results tab shows the test results.