Technical data
104 Notes on USB Electrical Compliance Testing
4 Hub Hi-Speed Tests
4 Place the test fixture Test Switch (S1) into the TEST position. This
switches in the data generator in place of the host controller. The data
generator emulates the "IN" packets from the host controller.
5 Click OK to close the Test Instructions dialog.