Technical data
N7280
N7280N7280
N7280-
--
-90034
9003490034
90034-
--
-
Rev. A
Rev. ARev. A
Rev. A
System
SystemSystem
System Installation and Verification
Installation and Verification Installation and Verification
Installation and Verification
20
2020
20
Figure 17: Air input
10
1010
10 Cabinet inspection—Inspect the inside of the cabinet to:
verify that there are no loose items
verify all stage securing ties are removed
11
1111
11 Air filter installation — Install the air filter on the top
of the x-ray tower. It fits into a recessed area on top of
the tower.
12
1212
12 Network connection - Have the customers IT
department connect up the x6000 Ethernet LAN cable
to their site LAN.
13
1313
13 AC main hookup — Work with the customer’s
electrician to provide main power installation to local
code.
Medalist x6000 systems are pre-wired with a cord and plug. The local electrician will only need to
install a suitable outlet where the plug can be inserted. Follow local code regulations.
For general service feed location, see Figure 18.
Normal requirements are:
PDU power option 3PD = 200-240VAC Delta 3-
Phase
PDU power option 3PY 208-220VAC Wye 3-Phase
PDU power option 3PN 220/380-240/415VAC Wye
with Neutral 3-Phase
Wiring configuration information can be found in
Wiring Configuration – Appendix B.
Air input assembly
Air input
(80 - 125 PSI)
NOTE